Educational

Canyon Day JHS Athletic Facility Addition & Renovation

Owner: Canyon Day Unified School District
Contract: $4,798,321.00
Square Footage: 14,166
Location: Whiteriver, Arizona
Job Summary:
Construct and equip new athletic building for the Whiteriver Unified School District. Renovation portion of the project consisted of replacing existing facade, improving existing parking lot, and construct a new drainage channel to correct an existing site drainage problem.

Read More

Dilcon Community School Sports Field & Kitchen

Owner: Dilcon Community School
Contract: $640,971.26
Location: Dilcon, AZ
Job Summary:
This project was located in Dilcon, Arizona and consisted of the construction of two (2) Baseball/Softball Playing fields and one (1) Football/Soccer field with fencing, backstops, goal posts, line markers, dug-outs irrigation grass and parking areas and the renovation of one modular classroom and the kitchen.

Read More

Navajo Technical College

Owner: Navajo Technical College
Contract: $1,247,617.63
Square Foot: 5950
Location: Crownpoint, NM
Job Summary:
This project consisted of the construction of a pre-fabricated metal building to be used as an Information Technology Center that included a computer equipment room, equipment work room, classrooms, conference room, offices, mechanical/electrical room, janitorial room and restrooms

Read More

Northland Pioneer College Snowflake Multi-Purpose Bldg. Renovation

Owner: Northland Pioneer College
Contract: $118,301.92
Location: Snowflake, AZ
Job Summary:
This project was a remodel and renovation of the existing collage space to include classrooms, offices, laboratories and common areas. Project included significant structural corrections to the existing building.

Read More

Northland Pioneer College—Whiteriver Center

Owner: Northland Pioneer College
Contract: $1,421,361.00
Square Foot: 7,500
Location: Whiteriver, AZ
Job Summary:
This project entailed building a 7,500 SF CMU building for the campus center, extensive entry drive, parking/lighting, and associated utilities. The building included full computer networking, laboratory, and a library security system. The specifications required excavation to bedrock (4-16 FT), lime stabilization, and backfill. The excavation/stabilization/backfill were all accomplished in 3 weeks, allowing the project to proceed on schedule. Close supervision and monitoring of the project provided completion on schedule and under budget.

Read More

NPC Painted Desert Campus Renovation

Owner: Northern Pioneer College
Contract: $ 2,042,851.00
Square Footage: 7,524 remodel; 8,399 addition
Location: Holbrook, Arizona
Job Summary:
Project consisted of the remodel and addition of classrooms and office areas of a former US Air Force base purchased by Northland Pioneer College. Project included extensive demolition, site-work, concrete slabs, CMU, structural steel, electrical, plumbing, framing, drywall, and typical commercial finishes. Due to the nature of the project (demolition/remodel) several unforeseen conditions were encountered throughout the construction process. Additionally, the project was significantly redesigned at the 50% point requiring intense coordination with all subcontractors and suppliers.

Read More

NPC Skills Center

Owner: Northland Pioneer College
Contract: $4,976,745.81
Square Foot: 27000
Location: Holbrook, AZ
Job Summary:
The addition of a 27,000 square foot pre-engineered metal building housing the skill development trades was the focus of this project. This facility is to be used to train welders and carpenters for the new Potash Mining Operation

Read More

NPC Snowflake Multi-Purpose Building Renovation

Owner:
Contract:
Square Foot:
Location:
Job Summary:
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Read More

Theodore Roosevelt School Renovation

Owner: BIA—Western Regional Division
Contract: $3,490,275.00
Location: Whiteriver, AZ
Job Summary:
This project was on an Indian Reservation and was a historic renovation of the school, dining building, and dormitory while school was in session. Work included mechanical and electrical system upgrades and retrofits, building accessibility improvements, interior and exterior maintenance items, site drainage, utility, and their improvements and renovations as per the drawings and specifications.

Read More

Waugh Chapel Renovation

Owner: Anne Arundel County Public Schools
Contract: $1,721,684.99
Square Foot: 5700
Location: Odenton, MD
Job Summary:
The project consisted of a new gymnasium addition to an existing 35 year old Elementary School located in Anne Arundel County, Maryland. This  addition is approximately  5700 sq. ft. masonry addition with a wood floor gym and a mechanical mezzanine. Along with this there are new bathrooms , equipment storage and Gym Instructor office. It was outfitted with basketball glass backboards , Volleyball equipment and a rock climbing wall. The exterior work also includes 2 Micro-bio-retention ponds also known as rain gardens with extensive landscaping to handle the storm drains from the new addition and the other to handle the parking lot water run off

Read More

Zuni Head Start Facility

Owner: Pueblo of Zuni
Contract: $2,676,540.00
Square Foot: 14,000
Location: Zuni, NM
Job Summary:
This project included the construction of three buildings with commercial kitchen, parking and drive, and associated utilities. The project was located in a flood plain and required over excavation and build up of the pad areas. Additionally, due to the location and the non-availability of utilities, this entire project was built utilizing generators and trucked water. In spite of these restrictions, the project was successfully completed under budget and on time.

Read More