Pinetop-Lakeside Recreation Complex

Owner: BIA—Western Regional Division
Contract: $1,378,254.76
Location: Lakeside, AZ
Job Summary:
This job included four soccer fields, two baseball fields, parking with drainage, full landscaping with irrigation, irrigation lake, and a two story CMU concession facility. It was discovered during the course of construction that the drainage study used to develop the plans for this project were significantly flawed. During construction over 50% of the area was under water after heavy rains, and the remaining areas heavily saturated. In spite of this obstacle, the project was completed under the budget estimate.