BIA Fair Consolidated #31

Owner: White Mountain Apache Tribe
Contract: $797,199.50
Square Foot:
Location: Whiteriver, AZ
Job Summary:
Whiteriver Construction performed road construction services for Consolidated 31, Routes 42 and 46. This project consisted of milling and asphalt overlay over 3 miles of existing roadway surface.

  • Picture17
  • Picture18